Case Study
How application expertise and custom engineering helped return a critical legacy power asset to service under exceptional time pressure.
When critical infrastructure fails and no standard replacement exists, restoring service becomes an engineering challenge. Decades of modifications, incomplete documentation, and non-standard interfaces meant the team first had to understand the legacy installation before developing a replacement solution.
TE Connectivity combined application expertise, custom engineering, manufacturing, logistics, and field support to reconstruct the installation requirements and develop a customized 245 kV termination, helping return the critical asset to service in approximately four weeks.
300
MVA critical generation infrastructure restored
245 kV
custom termination solution
~4
weeks from problem identification to energization